    04/20 August 2020

    23.10.2020

    Refurbishment of forming section and curing oven      

    The content of the project was a partial repair of the forming section, where a new flight conveyor was manufactured and installed completely in a stainless steel design, and a more extensive repair of the curing oven. On the curing oven, both flight conveyors, sprocket wheels, bearings, rails of the lower flight conveyor and a small part of rails of the upper flight conveyor were replaced. Doors, transversal and a selected part of longitudinal sealings were also delivered, repaired and replaced. Site manager was Mr. Roman Zadrobílek.